Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
接近搜索

项目状态 Updates

公共工程 Ian Projects

Hurricane Ian Projects

Learn about the ongoing 公共工程 and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.

Fire Station 3 Replacement

Fire Station 3 Replacement 销售税项目

Last Updated: 06/27/2024 Category: 县设施 Category: 已缴纳的销售税 当前阶段: Planning and Project Approval

Construct a new fire station at a location to be determinded, replacing the old fire station. New fire station will generally conform to a new prototype design for new and replacement stations. Includes land acquisition for station to be located nearby present location.

阅读更多

威廉R 盖恩斯小. Veterans Memorial Park Phase II

威廉R 盖恩斯小. Veterans Memorial Park Phase II 销售税项目

Last Updated: 06/27/2024 Category: Parks And 娱乐 Category: 已缴纳的销售税 当前阶段: Design Development

威廉R. 盖恩斯小. Veterans Memorial Park phase II design and construction.

阅读更多

Mid-County Library Hurricane Repairs

Mid-County Library Hurricane Repairs

Last Updated: 06/27/2024 Category: 县设施 当前阶段: Design Development

Utilizing the Hurricane repair consultant contract as well as the construction manager at risk for Mid-County repairs contract, design and restore the Mid-County Library to its condition prior to the event. Utilize the opportunity to make improvements to the facility where applicable following the guidelines of the County's insurance policy. 

阅读更多

Fire Station 6 Replacement

Fire Station 6 Replacement 销售税项目

Last Updated: 06/27/2024 Category: 县设施 Category: 已缴纳的销售税 当前阶段: Planning and Project Approval

Construct a new Fire Station at a location to be determinded, replacing the old fire station. Includes land acquisition for station to be located nearby present location.

阅读更多

第17消防站

第17消防站 销售税项目

Last Updated: 06/27/2024 Category: 县设施 Category: 已缴纳的销售税 当前阶段: Planning and Project Approval

Construct a new Fire Station at a location to be determinded.

阅读更多

G.C. Herring Park Phase I 欧博体育官网 Image

G.C. Herring Park Phase I 销售税项目

Last Updated: 06/27/2024 Category: Parks And 娱乐 Category: 已缴纳的销售税 当前阶段: Design Development

GC Herring Phase I design and construction. Redevelopment of the park will include necessary amenities for a community park as identified in the Parks and 娱乐 master Plan. 

阅读更多

Myakka公园 欧博体育官网 Image

Myakka公园

Last Updated: 06/24/2024 Category: Parks And 娱乐 当前阶段: Planning and Project Approval

Creation of a master plan through the park design process and phase 1 development.

阅读更多

贝蒂湖公园

贝蒂湖公园

Last Updated: 06/24/2024 Category: Parks And 娱乐 当前阶段: Planning and Project Approval

Park master plan for 贝蒂湖公园

Phase 1 of the Master Plan includes a toddler playspace, ropes/ninja style athletic course, 野餐展馆, 行走路径, and an improved parking lot.

阅读更多

Peachland Boulevard at Harbor Boulevard Intersection Improvments 欧博体育官网 Image

Peachland Boulevard at Harbor Boulevard Intersection Improvments

Last Updated: 06/24/2024 类别:巷道 当前阶段: Design Development

The design and construction of new turn lanes and traffic signal modifications at the intersection of Peachland Boulevard and Harbor Boulevard.

阅读更多

Delivering Exceptional Service

问题? 问题?

欧博体育